ADVERTISEMENT FOR BIDS

Project: Greenwood Townhouses 900 Greenwood Ave. Monroe, Mi 48162
Implementation of the 2015, 2016 Capital Fund Program for:
Kitchen Cabinets, Floor Replacement and Counter Tops
Owner: Monroe Housing Commission
20 North Roessler Street
Monroe, Michigan 48162
Architect: James S. Jacobs Architects, PLLC
25 Washington Street
Monroe, Michigan  48161
Phone: (734)241-7933
Fax:     (734) 241-1181Email: jimj@jsjacobsarch.com

Project Description:

Greenwood Townhouses 900 Greenwood Avenue, Monroe, Mi 48162 – Implementation of the 2015, 2016 Capital Fund Program for first floor interior kitchen and floor finish renovations of the 2, 3, and 4 bedroom apartments. In general the scope of work includes: Upper and lower kitchen cabinet, countertop, and plumbing fixture removal and replacement. Removal and replacement of all underlayment (assumed to be two layers of underlayment and VCT tile flooring existing) to the sub-floor, installation of a new underlayment material and plank “wood look” vinyl flooring throughout the first floor of each apartment. The apartments are to be occupied throughout the construction. The contractor shall be responsible for providing temporary relocation and storage of the occupant’s belongings in an on-site secured container throughout the construction of each unit. Work shall be completed in a fashion that minimizes the time of disruption to the tenants. Work shall include all necessary Mechanical, Plumbing, and Electrical work for a complete installation using the dedicated allowances as outlined in the bidding documents. The goal is to ultimately complete renovations of all 111 units within the complex. However, with limited funds it is anticipated that only a portion of the work can be accomplished with these dedicated funds. As additional funds are secured the remaining scope of work would be completed. This, however, may occur over a multi-year process. Work was recently completed in a model unit that will be viewed during the pre-bid walk-through. This unit shall serve as the Owner’s base level of performance.

Bid Due Date: Prior to 3:00 PM Local Time Wednesday, March 29, 2017
Proposals delivered after the designated time will not be accepted.
Invitation:    

 

Sealed Bids will be received by the Monroe Housing Commission and will be publicly opened and read at 3:30 PM. Bid proposals will be received at the office of the Owner.

                          Monroe Housing Commission
                          20 North Roessler Street
                          Monroe, Michigan 48162
                          Attn. Nancy Wain, Executive Director

Bidding:  Include the following documents with the Bid Form

  • Representations, Certifications, and Other Statements of Bidders HUD – 5369A
  • Certificate Regarding Debarment and Suspension HUD-2292
  • Non-Collusive Affidavit
  • Bid Bond
  • Section 3 Implementation Plan

Bid Proposals must be submitted in duplicate within a sealed envelope, and on forms provided by the Architect and will publicly be opened at 3:30 PM read and recorded.

Owner reserves the right to reject any, part of any, or all bids and to waive any irregularities in bidding.

Pre Bid Conference: Bidders are encouraged to attend a Pre-Bid Conference and Walk-Through conducted by the Architect on Monday, March 13th, 2017 at 10:30 AM and/or 1:30 PM to gain a better understanding and extent of the overall project scope. Bidders are required by the Instructions to Bidders to visit the Greenwood Townhouse site. The site is available for inspection 10:30 AM, Monday, March 13, 2017 during the Pre-Bid Conference and, by appointment, from March 13th through March 21st Monday through Thursday between the hours of 10:00 AM and 3:30 PM. Appointments can be made by calling Monroe Housing Commission (734) 242-5880. A sign in sheet will be available at the site.
Bid Documents: Contract Documents will be made available on the Monroe Housing Commission website at www.monroehousing.org on Monday, March 13, 2017 for potential bidders. Printed Contract Documents and Bid Package will be made available to General (Prime) Contractors at the Pre-Bid Conference, Monday, March 13, 2017 for a charge of $50.00 a set. Contact Architect to reserve contract document sets (up to three (3) sets) by March 9th for pick up at Pre-Bid Conference. The deposit is refundable in full only if the Contract Documents are returned within ten (10) days after the bid date and are in useable condition as determined by the Architect.

Documents will be available for review at the office of the Architect; James S. Jacobs Architects, PLLC, 25 Washington Street, Monroe, Michigan 48161, (734) 241-7933

(Documents here.)

BID BOND: Each proposal submitted must be accompanied by a bond from an approved surety company, in an amount not less than five (5%) percent of proposal amount. No other bid security will be accepted.
Performance Bond:  Each successful bidder will be required to furnish a performance bond and labor and materials payment bond equal to one hundred (100%) percent of the contract including accepted alternates, if any, and in accordance with the contract conditions. Premium for bonds shall be included in the base bid.
HUD Section 3:  Contractors shall comply with HUD Section 3 requirements and shall make every effort to hire area residents.
WAGE RATES: The rates of wages and fringe benefits to be paid to each class by the bidder, shall be not less than the wage and fringe benefit rates in accordance with Davis Bacon Wage Determination prevailing in the locality in which the work is to be performed and they must reflect the State of Michigan, Monroe County prevailing wage rates and fringe benefits.
Withdrawal of Bids: Bidder may withdraw its bid at any time prior to the scheduled time for opening bids without penalty.

Bid proposals shall not be withdrawn for a period of 60 days subsequent to opening of bid.

March 6, 13, 2017

Documents:
History: Updated 3/15/17 to add Addendum #1 and Pre-bid Conference minutes.

Updated 3/17/17 to add Pre-Bid Conference (Revision #1).

Updated 3/27/17 to add Addendum #2.